Subject: 350MW COAL FIRED POWER PLANT, BUILT 2012 (50Hz)


Date: 11/21/2025 1:55:56 PM

Details: Reviews 0

We offer a 350 MW subcritical coal-fired power plant, commissioned in 2012 for relocaton with immediate availability.

The plant was commissioned in 2012, realized with state-of-the art environmental controls.

The unit achieves 350MW at up to 38% overall efficiency.

The unit design ensures high reliability and high availability of baseload power, providing some flexibility by allowing turndown capability to 40%.

The 350 MW power block is designed to deliver reliable, scalable, and efficient energy production by repurposing the infrastructure of a former coal power plant.

This innovative approach maximizes value from existing assets while supporting the global transition to sustainable energy.

To see the contact details please Login or Register
Contact Name:
Company Name:
Mobile Phone:
Phone:
Fax:
Country:
E-Mail:
Web:

Comments      Add New Message

Leave a reply

Replace the security code

We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X