No
|
Customer
|
Specifications
|
Contract
|
Date
|
Country
|
|
1
|
SINO PP WOVEN (NIG) LIMITED
|
1MW/400V
|
D/I/A
|
2001.1
|
NIGERIA
|
|
2
|
VIVA METAL & PLASTICS INDUSTRIES LTD., NIGERIA
|
6MW/6300V
|
Turnkey
|
2001.6
|
NIGERIA
|
|
3
|
SANKYO STEEL MILL COMPANY LIMITED, NIGERIA
|
6MW/6300V
|
Turnkey
|
2001.10
|
NIGERIA
|
|
4
|
MAYOR ENGINEERING COMPANY LTD., NIGERIA
|
7MW/6300V
|
Turnkey
|
2001.12
|
NIGERIA
|
|
5
|
ASIA PLSTICS INDUSTRY ( NIGERIA ) LTD.
|
17MW/11KV
|
Turnkey
|
2002.7
|
NIGERIA
|
|
6
|
WESTERN METEL PRODUCTS COMPANY LIMITED
|
6MW/11KV
|
Turnkey
|
2003.7
|
NIGERIA
|
|
7
|
OMO WOOD INDUSTRY LIMITED
|
6MW/11KV
|
Turnkey
|
2003.7
|
NIGERIA
|
|
8
|
VIVA METAL & PLASTICS INDUSTRIES LTD., NIGERIA (2nd stage)
|
3MW/6300V
|
Turnkey
|
2003.8
|
NIGERIA
|
|
9
|
MAYOR ENGINEERING COMPANY LTD., NIGERIA (2nd stage)
|
2MW/6300V
|
Turnkey
|
2003.8
|
NIGERIA
|
|
10
|
HONEY PLASTIC PRODUCTS LIMITED
|
1MW/400V
|
Turnkey
|
2003.8
|
NIGERIA
|
|
11
|
SINO PP WOVEN (NIG) LIMITED (2nd stage)
|
1MW/400V
|
Turnkey
|
2003.8
|
NIGERIA
|
|
12
|
DAUSAYI power plant
|
5MW/11KV
|
Turnkey
|
2005.10
|
NIGERIA
|
|
13
|
GRAND power plant
|
6MW/11KV
|
Turnkey
|
2005.12
|
NIGERIA
|
|
14
|
JIGAWA power plant
|
5MW/11KV
|
Turnkey
|
2006.4
|
NIGERIA
|
|
15
|
WAB power plant
|
3x0.5MW/400V
|
Turnkey
|
2006.6
|
NIGERIA
|
|
16
|
EL FASHIR POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.1
|
SUDAN
|
|
17
|
DONQOLA POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.3
|
SUDAN
|
|
18
|
UM RAWABA POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.3
|
SUDAN
|
|
19
|
SHENDI POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.5
|
SUDAN
|
|
20
|
AN NAHUD POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.5
|
SUDAN
|
|
21
|
GUINENA POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.8
|
SUDAN
|
|
22
|
AD DIAIN POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.8
|
SUDAN
|
|
23
|
KADUQLI POWER PLANTOF NEC
|
2MW/11KV
|
D/I/A
|
2002.10
|
SUDAN
|
|
24
|
MALAKAL POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.10
|
SUDAN
|
|
25
|
JUBA POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2002.12
|
SUDAN
|
|
26
|
TENDALTY POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
27
|
RAHAD POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
28
|
WADI-HALFA POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
29
|
ELFULLA POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
30
|
ABRI POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
31
|
HAMED POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
32
|
TOKAR POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
33
|
DALING POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
34
|
BROM POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
35
|
ZALING POWER PLANT OF NEC
|
2MW/11KV
|
D/I/A
|
2006
|
SUDAN
|
|
36
|
POWER PLANTS PRESENTED BY CHIESE GOVERMENT
|
40x0.5MW/400v
|
D/I/A
|
2006
|
SUDAN
|
I have experience of almost 09 years in different kinds of power plant operation & maintenance under mechanical engineering such as Diesel, Gas and HFO Fired STX MAN, Wartsila & Jenbacher Engines / Generators and its Instruments. Different kinds of centrifugal & positive displacement Pumps repair, overhaul, installation and operation. Cylinder Head, liner & pistons, Fuel injectors & high-pressure pump, Piston and Screw type Air Compressors, Oil & Fuel Purifiers, Boilers, Chillers / HVAC, Hydraulic system and other Mechanical equipment’s Installation, Overhaul, Maintenance and Repair.
Thank you so much for your time and consideration.
Md. Imran Nazir Dilbaher
Karbala, Iraq.
Email: imrannazir9107@gmail.com
Cell: +96407779007017
WhatsApp: +8801770087822
I working power,plat 20 exp
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X