Supply of Capital Spare Parts for Hitachi H-25 Gas Turbine & W251B11/12 2nd Stage Blades

Subject: Supply of Capital Spare Parts for Hitachi H-25 Gas Turbine & W251B11/12 2nd Stage Blades


Date: 10/14/2025 7:29:49 AM

Details: Reviews 0

REQUEST FOR QUOTATION (RFQ)
RFQ Reference No.: MS-0779

 
Dear Sir/Madam,

We are requesting your best commercial and technical quotation for the supply of the following capital spare parts required for our upcoming maintenance outage for the Hitachi H-25 Gas Turbine. All items must be new, genuine, and compliant with OEM standards.

1.       Hitachi H-25 Gas Turbine – Capital Parts

S. No. Part Description Drawing / Part No. Required Qty Remarks
1 Combustion Liner 310QK24-657 (4) 10 EA Genuine/OEM equivalent
2 TP Clamps / Bull Horns 310QC32-464 (2) 10 EA
3 Turbine 1st Stage Stationary Nozzle 310PB34-596 (1) 16 Segments
4 Turbine 1st Stage Shroud Blocks 310PB44-454 (7) 20 Segments
5 Turbine 2nd Stage Stationary Nozzle 310PB44-457 (1 & 2) Part #1 = 22 Segments / Part #2 = 2 Segments
6 Turbine 1st Stage Buckets 310QC56-102 (3) 82 EA

 

2.       Westinghouse W251B11/12 Gas Turbine – Blades

Description Original Part No. Material Qty Remarks
2nd Stage Turbine Blade 1275E99G02-11 Inconel 738 (MCrAlY coated, 13 cooling holes) 51 EA OEM/Equivalent quality

 

3. Technical & Commercial Requirements
 

All parts must be OEM or OEM-approved equivalents meeting or exceeding original material and dimensional specifications.
 

OEM authorization/proof: We will require an OEM authorization letter or documented OEM approval for Hitachi or Westinghouse parts (if offered as “OEM”); if they are aftermarket, then please share detailed manufacturing certificates and test reports. 

  • Certification of origin, conformity, and quality (material test certificates, coating details, and balancing reports) must be provided.
  • Please confirm if these are new OEM, new aftermarket, or refurbished/exchanged.
  • Traceability & material certificates: We will eventually require Mill Test Certificates (MTC), chemical composition, coating specifications (e.g., MCrAlY), heat-treatment records, and dimensional inspection reports.
  • Third-party inspection: We will require SGS / BV / Intertek pre-shipment inspection and material analysis (especially for critical hot-section parts).
  • Warranty: Minimum 18 months from delivery or 12 months after installation, whichever occurs first.
  • Delivery terms: CIF Islamabad/Pakistan (preferred) / FOB (alternative acceptable).
  • Quotation validity: Minimum 90 days.
  • The required delivery lead time needs to be mentioned clearly.
  • Vendors must indicate the manufacturing country and applicable export compliance (if any).
  • Please provide references for prior deliveries of the same part number, and request photos of the batch and packing. 
  • Please provide correct export documentation to ensure that parts can be legally exported/imported (some hot-section manufacturing processes or coatings can have export control implications).
  • Warranty & acceptance tests: Explicit warranty (performance & defect liability) and acceptance test criteria (balance, visual, dimensional).

 

4. Vendor Information Required

Please include the following with your quotation:

  1. Company profile and OEM authorization (if applicable).
  2. Delivery period and incoterms.
  3. Payment terms.
  4. Full contact information (address, phone, email, website).

Quotation Submission:
Please submit your best offer by 15th October, 2025, to:
 

Thank you for your prompt response and cooperation.
We look forward to receiving your best offer.

Best regards,

To see the contact details please Login or Register
Contact Name:
Company Name:
Mobile Phone:
Phone:
Fax:
Country:
E-Mail:
Web:

Comments      Add New Message

Leave a reply

Replace the security code

We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X