Subject: LM6000 PD SPRINT 50HZ Cogeneration Package For Sale


Date: 4/14/2026 12:20:15 AM

Details: Reviews 0

LM6000 PD SPRINT 50hz Cogeneration Package for sale

Manufacture Year: 2009 / Installation: 2012

Maintained by OEM under LTSA with all OEM recommendation maintenance completed

Package History: 96,000 hours / 498 starts (baseload operation)

Engine replacement at ~66,000 hours

Post Overhaul: 30,300 hours / 98 starts

ISO Output: 46.902 MW

ISO Heat Rate: 8,272 Btu/kWh

Emissions: NOx 83 mg/Nm³, CO 122 mg/Nm³, Particulates 12 mg/Nm³ , SO? nil

Equipment List:

  1. Gas Turbine / Enclosure: GE LM6000 PD SPRINT, ESN 192-282 (2009 mfg., exchanged 2021) - triple annular combustor (no water injection)
  2. Generator: Brush BDAX 7-290ERJT — 50.8 MW / 63.5 MVA, 11.5 kV, 50 Hz, 0.8 PF
  3. Gearbox: Lufkin NFVQ2419-D — ratio 1.209:1
  4. HRSG: DKME Korea DKS2107H01 — 52 t/hr, 103 barg, 313°C, single pressure, natural circulation
  5. Gas Booster Compressors: 2x Ariel JGC/4 NGBCs — NGBC-A: ~97,280 hrs; NGBC-B: ~5,800 hrs (near-new)
  6. Gas Circuit Breaker: ABB, 4000A, 11 kV
  7. Controls: Woodward; MicroNet Plus controller Bently Nevada 3500 vibration monitoring
  8. DCS/ SCADA: ABB 800xA v5.1 — ESD, electrical SCADA & DCS (virtualized on new hardware 2023)
  9. Inlet Air System: Eagle MERV 17 two-layer filtration with pulse-jet cleaning (upgraded 2024)
  10. CO? fire suppression, Siemens CEMS (Oxymat/Ultramat), hydraulic starter, gas chromatograph spare parts inventory

Sold "as is, where is". Buyer responsible for packaging and transport. Equipment currently installed at plant (mothballed) located in South Asia. Contact for further detail.

To see the contact details please Login or Register
Contact Name:
Company Name:
Mobile Phone:
Phone:
Fax:
Country:
E-Mail:
Web:

Comments      Add New Message

Leave a reply

Replace the security code

We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X