Subject: LOOKING FOR GE FRAME 6B


Date: 4/29/2024 9:25:58 AM

Details: Reviews 1

Hello,

We are looking for 2 Complete units of GE frame 6b, please revert to me with details if you have.

Thank You

To see the contact details please Login or Register
Contact Name:
Company Name:
Mobile Phone:
Phone:
Fax:
Country:
E-Mail:
Web:

Comments      Add New Message

Paolo Marzari
4/30/2024 10:49:54 AM Switzerland

FOR SALE

 


The object of sale includes the following main components on which the following work has been carried out:

Frame 6 B gas turbine PG 6561B, LEC upgraded Thomassen, Serial No. 296867 converted in 2009 from Syngas to LEC natural gas combustion system
GT transmission, BHSAD 66 USO
Generator Alstom T 214-234
GT controller system (Mark V)
Co2 fire extinguishing system of the gas turbine
Heat recovery steam generator, standard boiler Duisburg 4x4 sygas-fired additional burner
Main steam turbine, double extraction - contensation turbine
ABB Turbine Nürnberg GmbH, type VEE 40
Boiler feed water pumps 1 and 2 Sulzer Pumps Germany
Contensation steam turbine SST 060, Siemens Turbomachinery
Cooling water pumps 1 and 2 and 3 KSB AG Dt.,
Cell cooling turbine 1 and 2, GEA Energietechnik GmbH
Full desalination plant 2.9 sqm, Hager and Elsässer GmbH

this also includes:
Housing gas turbine generator set with filter house
Gas turbine machine transformer 10/30 KV; 55 MVA, Pouwels
Heat recovery steam generator with gas turbine - flue gas duct and chimney
Machine house - steel structure, isopanels
Steam turbine machine transformer 10/30 KV; 37.5 MVA
both cell coolers
Gas reducing station - without the building itself
Double girder overhead traveling crane 25 to. and 6.3 tons,
Elevator boiler house 500 ZPP, GEDA -

During the conversion of the GUD to natural gas, the following work was carried out on the main units
Gas turbine
Hot gas path inspection
Exchange of the 10 transition pieces
Exchange of the 10 burners with cross ignition tubes
Exchange of the guide and blades of all 3 stages
Installation of a LO Nox system
Adaptation of the control to the new driving style (software change)
Transmission revision
Refilling the turbine oil

In 2010 a 3-stage air filter was installed
Gas turbine generator
pull large revision with inductor
Insulation measurements
The conversion of the GT was carried out by Ansaldo Thomassen.

Steam turbine
open the turbine
Bring runners to the factory, material tests, blasting, sheet metal, balancing
Reseal parting joint
Close withdrawals that are no longer required
Realignment of the runner
Renewal of sealing steam control
New turbine control and adaptation to the steam turbine generator control system
The same work was carried out on the generator as on the GT generator.
The revision work was carried out by Turbomaschinen (TMS).

Waste heat boiler
The AHK received a water pressure test
Comprehensive material tests were carried out
All TÜV-relevant tests including the associated containers and pipelines

The necessary documentation is available for all work carried out, from which further details can be found.
All specialist companies involved in the general overhaul and technical renewal can confirm that the power plant complies with current technical requirements, including environmental requirements.
Dismantling and rebuilding can be offered separately by us.

The price is 2.9 million EUR as is where is. and 1.6 million Euro for gas turbine generator set only 