Dear all,
THE FOLLOWING POWER PLANT IS AVAILABLE FOR SALE WITH US WITH IMMEDIATE DELIVERY:
1 No. - 420 MW SIEMENS ELECTRIC (2009/10) make, Combined Cycle Complete Power Plant, having the Following Technical Specifications:
PLANT DETAILS:
420 MW combined cycle plant the plant is based on two x Siemens SGT5-2000E(V94.2) gas turbines and steam turbine generator
The plant was installed in 2006, natural gas was available only from March 2009. The following are the commissioning dates of various equipment.
· GT # 1A - 30 March 2009
· GT #1B - 10 March 2009
· Open Cycle declared on 04 June 2009
· STG was commissioned on 22 June 2010
· Combined Cycle declared on 30 June 2010
The plant running hours as following:
GT # 1A = 32,361 EOH
GT # 1B = 22,913 EOH
STG = 19,460 EOH
STEAM TURBINE:
The operating hours of the steam turbine is 17900 hours.
GAS TURBINES:
Dehumidifier is built in feature of V94.2.
TECHNICAL SPECIFICATIONS:
Equipment | Manufacturer | Details | Qty |
Gas Turbine | Siemens Electric | V94.2, 139 MW | 2 |
Gas Turbine Generator | Electrosila | 2 | |
Steam Turbine | LMZ | K166/107, 158MW | 1 |
Steam Turbine Generator | Electrosila | 15.85kv, 200MW | 1 |
Heat Recovery Boiler | L&T | HP 222tph @107bar, MP 38tph @ 22bar and LP 19tph @4.5bar | 2 |
Generator Transformers | Crompton Greaves | 400 kv / 15.75 kv | 2 |
Auxiliary Transformers | Crompton Greaves | 6.6 kv / 415 v | 2 |
HP / IP/ LP Boiler Feedwater Pumps | Nasosenergomash/ Nasosenergomash/ Kirloskar | 270m3 /hr 65m3 /hr 25m3 /hr | 3 2 2 |
CEP | Nasosenergomash | 245tph | 2 |
DM Plant | Doshi Ion Exchange | 1 | |
CW Pumps | Kirloskar | 3 | |
CW Pump Motors | WEG | 3 | |
Cooling Tower | Paharpur | 16 cells | 1 |
Emergency Diesel Generator | Cummins | 1250kva | 1 |
Please advise your interest for price and other details
Best regards
Woonha Jee
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X