Dear all,
THE FOLLOWING POWER PLANT IS AVAILABLE FOR SALE WITH US WITH IMMEDIATE DELIVERY:
1 No. - 420 MW SIEMENS ELECTRIC (2009/10) make, Combined Cycle Complete Power Plant, having the Following Technical Specifications:
PLANT DETAILS:
420 MW combined cycle plant the plant is based on two x Siemens SGT5-2000E(V94.2) gas turbines and steam turbine generator
The plant was installed in 2006, natural gas was available only from March 2009. The following are the commissioning dates of various equipment.
· GT # 1A - 30 March 2009
· GT #1B - 10 March 2009
· Open Cycle declared on 04 June 2009
· STG was commissioned on 22 June 2010
· Combined Cycle declared on 30 June 2010
The plant running hours as following:
GT # 1A = 32,361 EOH
GT # 1B = 22,913 EOH
STG = 19,460 EOH
STEAM TURBINE:
The operating hours of the steam turbine is 17900 hours.
GAS TURBINES:
Dehumidifier is built in feature of V94.2.
TECHNICAL SPECIFICATIONS:
Equipment | Manufacturer | Details | Qty |
Gas Turbine | Siemens Electric | V94.2, 139 MW | 2 |
Gas Turbine Generator | Electrosila | 2 | |
Steam Turbine | LMZ | K166/107, 158MW | 1 |
Steam Turbine Generator | Electrosila | 15.85kv, 200MW | 1 |
Heat Recovery Boiler | L&T | HP 222tph @107bar, MP 38tph @ 22bar and LP 19tph @4.5bar | 2 |
Generator Transformers | Crompton Greaves | 400 kv / 15.75 kv | 2 |
Auxiliary Transformers | Crompton Greaves | 6.6 kv / 415 v | 2 |
HP / IP/ LP Boiler Feedwater Pumps | Nasosenergomash/ Nasosenergomash/ Kirloskar | 270m3 /hr 65m3 /hr 25m3 /hr | 3 2 2 |
CEP | Nasosenergomash | 245tph | 2 |
DM Plant | Doshi Ion Exchange | 1 | |
CW Pumps | Kirloskar | 3 | |
CW Pump Motors | WEG | 3 | |
Cooling Tower | Paharpur | 16 cells | 1 |
Emergency Diesel Generator | Cummins | 1250kva | 1 |
Please advise your interest for price and other details
Best regards
Woonha Jee
Seydou Habi | Click here to see contact details in the message |
6 -Turbine siemens SGT 800
This is a 420 MW – CC GTG + 1 – STG
6 – sgt-800 – 56 MW each + HRSD + STG
(s) to be supplied are unused, with zero running hours, never installed.
Gas Turbine Package:
Original year of assembly: 2022-2023
SGT 800 Gas Turbine Core Engine
Original assembly location: Europe
Never installed
AC Generator:
Original assembly location: SIEMENS Electrical Machines
Original year of assembly: 2022-23
Package and core engine serial numbers will be confirmed upon placement of order
The units̀̀̀̀̀̀̀̀ supporting documentation is available for review at any time with prior notice
Scope of Supply:
Driven unit
AC Generator
11 kV
3 phase
50 / 60 Hz
4 pole
0.8 power factor
Cylindrical pole brushless type
Filter ventilated
Class F insulation with class F total temperature rise
Generator bearing temperature instrumentation
Lubricating oil piping from gas turbine to driven unit
Gas Turbine Engine
SGT 800 Gas turbine engine – ISO Rating 45,3 MWe – two-stage uncooled variable free power turbine
offers nominal shaft speed up-to E5237227 7,700 rpm
T 0032465593976
Musa suleman | Click here to see contact details in the message |
we need the asking price and the pictures of the plant?
Musa suleman | Click here to see contact details in the message |
need pictures and the asking price of the Plant?
Woonha Jee | Click here to see contact details in the message |
Please advise your email address or you can send me email
Best regards
Woonha Jee
Hossam Mohammed | Click here to see contact details in the message |
Please send me your technical data cheet and drawing and best price
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X