Primary Requirement – Gas Turbine Generator Packages
Looking for 2–3 matched units, 50 Hz, 30–60 MW per unit. Natural gas preferred; dual fuel considered. New, unused/surplus, low-hour used or refurbished equipment will be considered. Complete turbine-generator packages with generator, controls and auxiliaries preferred.
Secondary Requirement – Steam Turbine Generator Packages
50 Hz, 30–60 MW. New, unused/surplus, low-hour used or refurbished equipment considered, preferably suitable for combined-cycle applications.
Equipment from cancelled or stalled projects, surplus inventory, never-commissioned plants and decommissioned facilities will also be considered.
Worldwide locations considered. Immediate or short lead-time availability preferred.
We use cookies to improve your experience. By continuing to use our site, you accept our Cookies, Privacy Policy,Terms and Conditions. Close X